Anyway, here is the list of things I have left to complete:
- Tighten Leaf Spring Bolts
- Paint Transmission Support Brace
- Prep Rear Floor Seam & Torque Boxes (Strip, Prime, & Seam Seal)
- Prep Driver Torque Box (Strip, Prime, & Seam Seal)
- Finish Work & Paint Toe Board Area in Driver Fenderwell
- Prep Front Frame Rails (Strip, Prime, & Seam Seal)
- Weld Passenger Parking Brake Bracket
- Cut Hole in Floor for Parking Brake Cable
- Repaint Throttle Linkage
- Remove Engine
- Smooth Underside Toe Board Weld
- Undercoat Floorpan
- Install Engine Mounts
- Reinstall Engine
- Seam Seal Upper Side of Floorpan
- Strip Underside of Dash
- Repair Cowl Hats
- Strip and Paint Front of Dash
- Install Sound Deadening
- Install Firewall Pad
- Install Dash Wiring
- Connect Electric Fan
- Install Pedal Assembly
- Install Clutch & Throttle Linkage
- Install Gauge Cluster
- Install Steering Column and Wheel
- Install Transmission
- Install Driveshaft
- Install Exhaust
- Install Parking Brake
- Install Gas Line
- Install Interior